Together with Developing Turkey, Energy Consumption has been increased rapidly for last 15 years and new Power Plants are required to provide the Energy Requirement of Turkey. OZCELIK ELCTROMECHANICS was established in 2007 to provide service for Superstructure and Infrastructure Electrical Works, Power Plants’, MV, HV and Control, Protection Systems, HV (154 – 380 kV) Switchyards EPC Construction in domestic and overseas markets.

OUR SERVICES

  • LV, MV and HV EPC Electrical Works
  • Engineering
  • Installation
  • SCADA and Automation
  • Repairement and Maintenance
  • Plant Operation
  • Training

CONTRACTING SUBJECTS AND STRUCTURES

  • Shopping Malls, Offices, Hospitals, Schools, Public Buildings Electrical Works
  • Power Plants’ M V and HV Electrical Systems
  • HV 154 kV, 380 kV Switchyard EPC Construction
  • MV, HV Transmission Lines
  • Control, Protection, Automation and SCADA Systems
  • Industrial Plants Electrical Works
  • Power Plant Electromechanical Systems (Turbine — Generator) Supply and Installation
  • Power Plants’ and Industrial Plants’ Steel Structure Production and Installation

ENGINEERING

For Electrical Works; Success of the Project depends to Experience and Expertise which Contractor Company has.

Ozcelik Electromechanics’ Engineering Works are;

  • Electrical Primary Project Design
  • Electrical Final Project Design
  • Steel Structure Design
  • Steel, Statical, Electrical Calculations

INSTALLATION

Electrical System is the most critical system of buildings, power plants and industrial plants. If the equipment and materials would be choosen from qualified brands, installattion quality determines the quality of the electrical system. Expert site engineers and Expert Workers are needed during the execution of the project from Mobilization to test and commissioning step of the project. Ozcelik Electromechanics has completed all its projects’ installattion works with minimum fault.

TEST AND COMMISSIONING

After the completion of installation and site works, first energizing of the system is done according to international and domestic Standarts with using periodically calibrated test equipments together with the Support of Ozcelik Electromechnics’ Experience and knowledge also customer requests and project needs.

HEALTH AND SAFETY

Human Health and Work Safety have priority in Ozcelik Group’s Business Principals and Ozcelik Group hasn t faced with any mortal and injury accident in Project Sites since the establishment of Company.

REFERENCES

154 kV - 380 kV HV SUBSTATIONS
  • 130 MVA KASIMLAR HPP 154 kV SUBSTATION EPC CONSTRUCTION WORKS
    Client: GULSAN HOLDING
  • 80 MVA ARTOVAciM 154 kV SUBSTATION EPC CONSTRUCTION WORKS
    Client: ADOÇİM
  • 100 MVA TRAKYA ÇİM 154 KV SUBSTATION and ENERGY TRANSMISSION LINE EPC CONSTRUCTION
    Client: LİMAK BATI ÇİMENTO
  • 50 MVA HİMMETLİ HPP 154 RV SUBSTATION EPC CONSTRUCTION WORKS
    Client: AK ENERJİ
  • 50 MVA GÖKKAYA HPP 154 RV SUBSTATION EPC CONSTRUCTION WORKS
    Client: AK ENERJİ
  • 150 MVA HACİNINOGLU HPP 154 kV SUBSTATION DESIGN INSTALLATTION WORKS
    Client: ENERJİSA
  • 210 MVA KANDİL HPP 154 kV SUBSTATION DESIGN INSTALLATTION WORKS
    Client: ENERJİSA
  • 600 MVA BEYHAN HES 380 kV SUBSTATION DESIGN INSTALLATTION WORKS
    Client: ALSTOM
  • 100 MVA SARIGÜZEL HPP 154 kV SUBSTATION DESIGN INSTALLATTION WORKS
    Client: ENERJİSA
  • 50 MVA KUŞAKLI HPP 154 RV SUBSTATION EPC CONSTRUCTION WORKS
    Client: ENERJİSA
  • ITM 23—B 154 kV LADiK SUBSTATION CONSTRUCTION, INSTALLATTION COMMISIONING
    Client: TEMSAN
  • ITM 23-B 154 kV YENİKÖY THERMAL POWER PLANT SUBSTATION CONSTRUCTION, INSTALLATTION COMMISIONING
    Client: TEMSAN
  • ITM 23-B 380 kV OYMAPINAR SUBSTATION CONSTRUCTION, INSTALLATTION COMMISIONING
    Client: TEMSAN
  • ITM 23—B 154 kV YENİKÖY SUBSTATION CONSTRUCTION, INSTALLATTION COMMISIONING
    Client: TEMSAN
ENERGY TRANSMISSION LINE and ELECTRICITY DISTRIBUTION SYSTEMS
  • GÜDÜL 1 HPP — DARENDE SUBSTATION 2 x 477 MCM ENERGY TRANSMISSION LINE CONSTRUCTION
    Client: İMA Mühendislik İnşaat
  • TOKAT ERBAĞ DISTRIBUTION CENTER CONSTRUCTION + TOKAT ERBAG UNDERGROUND DISTRIBUTION SYSTEM CONSTRUCTION +
    TOKAT ZİLE DITRIBUTION CENTER CONVERT/ON CENTER + TOKAT CENTRAL UNDERGROUND SYSTEM CONSTRUCTION
    Client: ÇAMLIBEL ELEKTRİK DAĞITIM A.Ş
  • SİVAS YILDIZELİ DISTRICT UNDERGROUND DISTRIBUTION SYSTEM CONSTRUCTION
    Client: ÇAMLIBEL ELEKTRİK DAĞITIM A.Ş
  • ANTALYA KADRİYE – BELEK UNDERGROUND DISTRIBUTION SYSTEM CONSTRUCTION
    Client: AKDENİZ ELEKTRİK DAĞITIM A.Ş
  • TOKAT NİKSAR DISTRIBUTION CENTER MODERNIZATION + TOKAT MAIN DISTRIBUTION CENTER MODERNIZATION +
    TOKAT 5 DISTRICTS UNDERGROUND DISTRIBUTION SYSTEM CONSTRUCTION
    Client: ÇAMLIBEL ELEKTRİK DAĞITIM A.Ş
  • ANTALYA MURATPAŞA EAST UNDERGROUND DISTRIBUTION SYSTEM
    Client: AKDENİZ ELEKTRİK DAĞITIM A.Ş
  • TOKAT PAZAR DISTRICT DISTRIBUTION CENTER MODERNIZATION
    and UNDERGROUND DISTRIBUTION CENTER CONSTRUCTION.
    Client: ÇAMLIBEL ELEKTRİK DAGITIM A.Ş
SUPERSTRUCTURE PROJECTS
  • UŞAK COURT HOUSE Trransformers, M V System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: EPSİLON CONSTRUCTION
  • TURKEY ANAMUR 150 BEDS PUBLIC HOSPITAL Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: VERA CONSTRUCTION
  • TURKEY IZMIR MUNICIPALITY ATATURK INDOOR SPORT STADIUM Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: VERA CONSTRUCTION
  • TURKEY KONYA ILGIN DISTRICT 100 BEDS PUBLIC HOSPITAL Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: EPSİLON CONSTRUCTION
  • TURKEY BOLU T TYPE PRISON Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: EPSİLON CONSTRUCTION
  • TURKMENISTAN ASHGABAT135.000 m2 BERKARAR SHOPPING MALL AND OFFICE BUILDING Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works Client: GUJURLY CONSTRUCTION
    Client: GUJURLY CONSTRUCTION
  • TURKMENISTAN ASHGABAT COURT HOUSE Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: GUJURLY CONSTRUCTION
  • TURKMENISTAN KGB OFFICE BUILDING Transformers, MV System, Low Current, High Current Systems and Electrical Infrastructure Works
    Client: GUJURLY CONSTRUCTION
POWER PLANTS
  • 17 MW CEVHER 1 & CEVHER 2 HYDROPOWER PLANT LV :9 M V Electrical Works and Control Protection Scada Works, Mechanical Works
    Client: CEVHER ENERGY GENERATION CO

  • 4 MW YAŞIL HYDROPOWER PLANT Electrical Works and Control Protection Scada Works, Mechanical Works
    Client: YAŞIL ENERGY GENERATION COMPANY

  • 620 kW AKKÖY CANSUYU HYDROPOWER PLANT LV B M V Electrical Works, Turbine Generator Supply and Mechanical Installattion
    Client: KOLİN HOLDİNG

  • DAM and HPP LV 8 MV Electrical Works and Control Protection Scada Works
    Client: KOLİN HOLDİNG

  • HPP LV 8 MV Electrical Works and Control Protection Scada Works
    Client: EN-SU ENERGY GENERATION CO

  • 7 MW AKDERE HPP LV 8 M V Electrical Works and Control Protection Scada Works
    Client: ERGÜNLER GROUP

  • HPP LVBM V Electrical Works and Control Protection Scada Works, Mechanical Works
    Client: ERGÜNLER GROUP